High anion gap metabolic acidosis with normal anion gap metabolic acidosis critical pathways
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Metabolic acidosis physician extender algorithm |
Elevated anion gap? | Yes | No |
Delta-delta (ΔΔ) value | Between 1 and 2 | Greater than 2 | Less than 1 |
Action Items
- Consider the coexistence of high anion gap metabolic acidosis and normal anion gap metabolic acidosis.