High anion gap metabolic acidosis with normal anion gap metabolic acidosis critical pathways
Jump to navigation
Jump to search
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
| metabolic acidosis critical pathways |
| Anion gap | High | Normal | Low |
| Delta-delta (ΔΔ) value | Greater than 2 | Between 1 and 2 | Less than 1 |
Action Items
- Consider the coexistence of high anion gap metabolic acidosis and normal anion gap metabolic acidosis.