High anion gap metabolic acidosis with normal anion gap metabolic acidosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) m (Gerald Chi moved page High anion gap metabolic acidosis with normal anion gap metabolic acidosis physician extender algorithm to High anion gap metabolic acidosis with normal anion gap metabolic acidosis critical pathways without leaving a redi...) |
Gerald Chi (talk | contribs) No edit summary |
||
Line 12: | Line 12: | ||
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | ||
| BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Delta-delta (ΔΔ) value || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis with metabolic alkalosis critical pathways|Greater than 2]] || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[Pure high anion gap metabolic acidosis critical pathways|Between 1 and 2]] ||BGCOLOR=MEDIUMAQUAMARINE STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis with normal anion gap metabolic | | BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Delta-delta (ΔΔ) value || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis with metabolic alkalosis critical pathways|Greater than 2]] || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[Pure high anion gap metabolic acidosis critical pathways|Between 1 and 2]] ||BGCOLOR=MEDIUMAQUAMARINE STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis with normal anion gap metabolic acidosis critical pathways|Less than 1]] | ||
|} | |} | ||
Revision as of 02:30, 11 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
metabolic acidosis critical pathways |
Anion gap | High | Normal | Low |
Delta-delta (ΔΔ) value | Greater than 2 | Between 1 and 2 | Less than 1 |
Action Items
- Consider the coexistence of high anion gap metabolic acidosis and normal anion gap metabolic acidosis.