High anion gap metabolic acidosis with normal anion gap metabolic acidosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) No edit summary |
||
Line 13: | Line 13: | ||
|} | |} | ||
==Action | ==Action Items== | ||
* Consider the coexistence of [[Pure high anion gap metabolic acidosis physician extender algorithm | high anion gap metabolic acidosis]] and [[Normal anion gap metabolic acidosis physician extender algorithm | normal anion gap metabolic acidosis]]. | * Consider the coexistence of [[Pure high anion gap metabolic acidosis physician extender algorithm | high anion gap metabolic acidosis]] and [[Normal anion gap metabolic acidosis physician extender algorithm | normal anion gap metabolic acidosis]]. | ||
Revision as of 00:28, 2 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Metabolic acidosis physician extender algorithm |
Elevated anion gap? | Yes | No |
Delta-delta (ΔΔ) value | Equal to 1 | Greater than 1 | Less than 1 |
Action Items
- Consider the coexistence of high anion gap metabolic acidosis and normal anion gap metabolic acidosis.