High anion gap metabolic acidosis with normal anion gap metabolic acidosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) |
Gerald Chi (talk | contribs) No edit summary |
||
Line 10: | Line 10: | ||
|} | |} | ||
{| {{table}} | {| {{table}} | ||
| bgcolor=lightyellow |Delta-delta (ΔΔ) value|| bgcolor= lightgray |[[Pure high anion gap metabolic acidosis physician extender algorithm|Equal to 1]]||bgcolor=lightgray |[[ | | bgcolor=lightyellow |Delta-delta (ΔΔ) value|| bgcolor= lightgray |[[Pure high anion gap metabolic acidosis physician extender algorithm|Equal to 1]]||bgcolor=lightgray |[[High anion gap metabolic acidosis with metabolic alkalosis physician extender algorithm|Greater than 1]]|| bgcolor=MediumAquamarine |[[High anion gap metabolic acidosis with normal anion gap metabolic acidosis physician extender algorithm|Less than 1]] | ||
|} | |} | ||
Revision as of 20:50, 1 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Metabolic acidosis physician extender algorithm |
Elevated anion gap? | Yes | No |
Delta-delta (ΔΔ) value | Equal to 1 | Greater than 1 | Less than 1 |
Action Item
- Consider the coexistence of high anion gap metabolic acidosis and normal anion gap metabolic acidosis.