Acute abdominal pain location critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) (Created page with "__NOTOC__ {{CMG}} ==Approach== {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | BGCOLOR=FLORALWHITE | {{Smallcaps|Abdominal pain critical pathways|abdominal pai...") |
(No difference)
|
Revision as of 00:49, 11 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
abdominal pain critical pathways |
Hemodynamically stable | Yes | No |
Duration of abdominal pain | Acute | Chronic |
Acute abdomen | Likely | Unlikely |
Location of abdominal pain | Diffuse | ||
Right upper quadrant | Epigastric | Left upper quadrant | |
Epigastric | Periumbilical | Hypogastric | |
Right upper quadrant | Left flank | Left upper quadrant |