Abdominal pain critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
Gerald Chi (talk | contribs) m (Gerald Chi moved page Abdominal pain physician extender algorithm to Abdominal pain critical pathways without leaving a redirect) |
(No difference)
|
Revision as of 22:00, 10 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Abdominal pain critical pathways |
Hemodynamically stable? | Yes | No |
Definition
- Abdominal pain is pain felt anywhere between the chest and the groin.
- Immunocompromised and elderly patients may have atypical patterns of presentation.
- A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.