Back pain critical pathways

Revision as of 21:10, 14 August 2013 by Gerald Chi (talk | contribs) (Created page with "__NOTOC__ {{CMG}} ==Critical Pathways== {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | BGCOLOR=FLORALWHITE | {{Smallcaps|Back pain critical pathways|back pain...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Critical Pathways

back pain critical pathways
Question 1 ANSWER 1 ANSWER 2

Definition

  • Back pain is pain felt in the back that may originate from the muscles, nerves, bones, joints or other structures in the spine.

References


Template:WikiDoc Sources