High anion gap metabolic acidosis with metabolic alkalosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
m (Bot: Removing from Primary care) |
||
Line 20: | Line 20: | ||
==References== | ==References== | ||
{{Reflist|2}} | {{Reflist|2}} | ||
{{WikiDoc Help Menu}} | |||
{{WikiDoc Sources}} | |||
[[Category:Critical pathways]] | [[Category:Critical pathways]] | ||
Line 25: | Line 27: | ||
[[Category:Medicine]] | [[Category:Medicine]] | ||
[[Category:Nephrology]] | [[Category:Nephrology]] | ||
Latest revision as of 22:10, 29 July 2020
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
metabolic acidosis critical pathways |
Anion gap | High | Normal | Low |
Delta-delta (ΔΔ) value | Greater than 2 | Between 1 and 2 | Less than 1 |
Action Items
- Consider the coexistence of high anion gap metabolic acidosis and metabolic alkalosis.