High anion gap metabolic acidosis with normal anion gap metabolic acidosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) No edit summary |
m (Bot: Removing from Primary care) |
||
(4 intermediate revisions by one other user not shown) | |||
Line 3: | Line 3: | ||
==Approach== | ==Approach== | ||
{| | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | ||
| | | BGCOLOR=FLORALWHITE | {{Smallcaps|[[Metabolic acidosis critical pathways|metabolic acidosis critical pathways]]}} | ||
|} | |} | ||
{| | |||
| | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | ||
| BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Anion gap || BGCOLOR=MEDIUMAQUAMARINE STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis critical pathways|High]] ||BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[Normal anion gap metabolic acidosis critical pathways|Normal]] || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[Low anion gap metabolic acidosis critical pathways|Low]] | |||
|} | |} | ||
{| | |||
| | {|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1" | ||
| BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Delta-delta (ΔΔ) value || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis with metabolic alkalosis critical pathways|Greater than 2]] || BGCOLOR=LIGHTGRAY STYLE="WIDTH:16.6%" | [[Pure high anion gap metabolic acidosis critical pathways|Between 1 and 2]] ||BGCOLOR=MEDIUMAQUAMARINE STYLE="WIDTH:16.6%" | [[High anion gap metabolic acidosis with normal anion gap metabolic acidosis critical pathways|Less than 1]] | |||
|} | |} | ||
==Action Items== | ==Action Items== | ||
* Consider the coexistence of [[Pure high anion gap metabolic acidosis | * Consider the coexistence of [[Pure high anion gap metabolic acidosis critical pathways | high anion gap metabolic acidosis]] and [[Normal anion gap metabolic acidosis critical pathways | normal anion gap metabolic acidosis]]. | ||
==References== | ==References== | ||
{{Reflist|2}} | {{Reflist|2}} | ||
{{WikiDoc Help Menu}} | |||
{{WikiDoc Sources}} | |||
[[Category:Critical pathways]] | |||
[[Category:Emergency medicine]] | [[Category:Emergency medicine]] | ||
[[Category:Medicine]] | [[Category:Medicine]] | ||
[[Category:Nephrology]] | [[Category:Nephrology]] | ||
Latest revision as of 22:10, 29 July 2020
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
metabolic acidosis critical pathways |
Anion gap | High | Normal | Low |
Delta-delta (ΔΔ) value | Greater than 2 | Between 1 and 2 | Less than 1 |
Action Items
- Consider the coexistence of high anion gap metabolic acidosis and normal anion gap metabolic acidosis.