Abdominal pain critical pathways: Difference between revisions

Jump to navigation Jump to search
No edit summary
m (Bot: Removing from Primary care)
 
(10 intermediate revisions by 2 users not shown)
Line 3: Line 3:


==Approach==
==Approach==
{|CELLPADDING=20 STYLE="WIDTH:80%; HEIGHT:50px" BORDER="1"
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1"
| BGCOLOR=LIGHTYELLOW |[[{{PAGENAME}}]]  
| BGCOLOR=FLORALWHITE | {{Smallcaps|[[Abdominal pain critical pathways|abdominal pain critical pathways]]}}
|}
 
{|CELLPADDING=20 STYLE="WIDTH:50%; HEIGHT:50px" BORDER="1"
| BGCOLOR=FLORALWHITE STYLE="WIDTH:50%"| Hemodynamically stable || BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Abdominal pain duration critical pathways|Yes]] ||BGCOLOR=LIGHTGRAY STYLE="WIDTH:25%" | [[Abdominal pain with hemodynamic instability critical pathways|No]]
|}
|}
{|CELLPADDING=20 STYLE="WIDTH:80%; HEIGHT:50px" BORDER="1"
| BGCOLOR=LIGHTYELLOW | Hemodynamically stable? || BGCOLOR=LIGHTGRAY | [[Abdominal pain duration critical pathways|Yes]] || BGCOLOR=LIGHTGRAY | [[Abdominal pain with hemodynamic instability critical pathways|No]]
|}]


==Definition==
==Definition==
Line 17: Line 18:
==References==
==References==
{{Reflist|2}}
{{Reflist|2}}
{{WikiDoc Help Menu}}
{{WikiDoc Sources}}


[[Category:Critical pathways]]
[[Category:Critical pathways]]
[[Category:Emergency medicine]]
[[Category:Emergency medicine]]
[[Category:Medicine]]
[[Category:Medicine]]
[[Category:Primary care]]
[[Category:Signs and symptoms]]
{{WikiDoc Help Menu}}
{{WikiDoc Sources}}

Latest revision as of 20:13, 29 July 2020

Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]

Approach

abdominal pain critical pathways
Hemodynamically stable Yes No

Definition

  • Abdominal pain is pain felt anywhere between the chest and the groin.
  • Immunocompromised and elderly patients may have atypical patterns of presentation.
  • A systolic blood pressure of more than 80 mm Hg and a proportional pulse pressure of more than 25% suggest adequate cardiac output.

References

Template:WikiDoc Sources