High anion gap metabolic acidosis with metabolic alkalosis critical pathways: Difference between revisions
Jump to navigation
Jump to search
Gerald Chi (talk | contribs) (Created page with "__NOTOC__ {{CMG}} ==Approach== {| {{table}} | bgcolor=lightyellow |Metabolic acidosis physician extender algorithm |} {| {...") |
Gerald Chi (talk | contribs) No edit summary |
||
Line 14: | Line 14: | ||
==Action Item== | ==Action Item== | ||
* Consider the coexistence of [[Metabolic acidosis causes #High Anion Gap | high anion gap metabolic acidosis and [[metabolic alkalosis]]. | * Consider the coexistence of [[Metabolic acidosis causes#High Anion Gap | high anion gap metabolic acidosis and [[metabolic alkalosis]]. | ||
Revision as of 15:51, 1 August 2013
Editor-In-Chief: C. Michael Gibson, M.S., M.D. [1]
Approach
Metabolic acidosis physician extender algorithm |
Elevated anion gap? | Yes | No |
Delta-delta (ΔΔ) value | Equal to 1 | Greater than 1 | Less than 1 |
Action Item
- Consider the coexistence of [[Metabolic acidosis causes#High Anion Gap | high anion gap metabolic acidosis and metabolic alkalosis.